Your project, in your region
Asbestos and pollutant surveys in Thurgau
Thurgau distinguishes three waste management stages: the permit dossier, the declaration before deconstruction and evidence after the work. The survey comes before this documentation sequence.
We work throughout Switzerland. State your preferred language for discussions and the report when enquiring.
Describe my projectConcepts and investigations at application submission
The cantonal page requires a concept for all industrial and commercial buildings and infrastructure, regardless of age or waste volume. Pollutant investigations depend on expected materials, age, uses and any contaminated-site information.
A declaration before deconstruction work
After municipal authorisation, a disposal declaration is prepared with the cantonal waste inspector and deconstruction contractor. Disposal records then allow the materials’ destinations to be verified.
Preparing the stages of your Thurgau project
- Specify current and previous building use and the permit stage.
- Attach available surveys and disposal concepts.
- Name the deconstruction contractor, if selected, and intended schedule.
Official source
Thurgau — Information for construction clients. Consulted on 15 October 2026, in German.
The next step
Your project deserves
a clear starting point.
Describe the building and what you are planning.
Documents can follow later.
We can communicate in French, German, English or Spanish.

