Asbestos and pollutant surveys in the canton of Zug

In Zug, the disposal table helps prepare the site and later documents what was actually disposed of or recovered. The survey supplies the pollutant information needed for that preparation.

We work throughout Switzerland. State your preferred language for discussions and the report when enquiring.

Describe my project
01

One table for planning and follow-up

The canton requires a concept with the permit when more than 200 m³ of waste or hazardous waste is expected. Disposal evidence is then submitted to the authority after the work. Both use the “Entsorgungstabelle Bauabfälle” template.

02

Additional information for complex projects

For large or complex projects, the cantonal page provides for a report in addition to the table. Describing phases and material flows helps organise investigations with the project representative.

03

Useful documents for a Zug site

  • The existing table, even if incomplete.
  • Plans, phases and categories of materials to remove.
  • Previous reports and available evidence for materials already removed.
04

Official source

Zug — Construction waste, disposal concepts and evidence. Consulted on 15 October 2026, in German.

The next step

Your project deserves
a clear starting point.

Describe the building and what you are planning.
Documents can follow later.
We can communicate in French, German, English or Spanish.

Let’s discuss your project